Saturday, April 9, 2016

Labeling and Packaging Part II

1) Labels and packaging are inspected and approved before they are stored, and are available for use in the packaging/labeling area. The inspection is performed by designated and qualified QC inspectors. QC inspectors must be trained and to have training record and other qualification to prove such qualification. 

2) Labeling/packaging inspection includes verification that:
  
2.1 ) The labels and packaging are printed using approved and appropriate (current revision level) artwork.
2.2) The materials like paper and ink and printing comply with specification, the quality and ink must also be great to ensure the paper and ink cannot deteriorate beyond legible and durable for years and

2.3)  Correct expiration dates, control numbers, lot number and serial numbers are used.

2.4 ) All the symbols were correctly used.
2.5 ) All translation was done right and verified to be so.

3) Results of the inspection and the date, name and initial of the individual inspectors performing the inspection are recorded in the production work order pertaining tolabeling and packaging operations.

4) Inspected and accepted labels and packaging are stored in designated cabinets in
the labeling/packaging area. Designated cabinets should be marked clearly. Where
mix-up of similar looking labels is possible, the labels are stored in separate cabinet

5) Should there be any out of specification labeling and packaging materials, they must be immediately quarantined and separated and conspicuously marked as such to
prevent Out of Specification (OOS) being accidentally being used.

Packaging and Labeling Operations

1) Packaging and labeling operations and processes should be considered production processes. All process control requirements and procedures that apply to manufacturing also apply to packaging and labeling. The operational procedures and other quality system documentation related to: 

1.1 Design transfer, e.g., development of packaging and labeling processes. 

1.2 Validation of special processes (in particular, packaging processes for sterile products, electrical testing, drop test etc)

1.3 Process control and monitoring activities.

1.4 Inspecting and testing the packaging and applied labeling.

2) Before commencing packaging or labeling operations for a new product or batch, the area is cleared of any packaging or labels left over from previous operations. This is to prevent mix-ups and the inadvertent use of wrong packaging or labels, for example, labels intended for a different product or with wrong control numbers or expiration dates.

3) The packaging and labeling operations, and the associated inspections and verifications are called out in the production work order. 

4) The inspections are part of the finished product acceptance, as documented in Operational Procedure for Final Acceptance Inspection. 

5) Where applicable, expiration dating and any control numbers are recorded in the work order exactly as they appear on the applied labeling.

Reference
Criteria
ISO 13485, 7.5.5.
Has the company established documented procedures or work instructions for preserving the conformity of product labeling during internal processing and delivery to the intended destination?
ISO 13485, 7.5.5.
Does this preservation include identification, handling, packaging, storage and protection?
ISO 13485, 7.5.5.
Has the company established documented work instruction for the control of product with a limited shelf life or requiring special storage conditions?
ISO 13485, 7.5.5.
Are special storage conditions controlled and recorded?
ISO 13485, 7.5.5.
Have procedures been implemented to ensured, where relevant, that labelling and instructions for use are translated correctly into foreign national languages versions according to the intended plan for placing the product on the market?
ISO 13485, 7.5.5.
Is it ensured, where relevant, that requirements for e.g. national language versions are checked and controlled in connection with dispatch, storage, etc.?
ISTA 208, 2A
Is the product withstand all tests stated in the ISTA guidelines
ASTM D-5276-98
Is the product withstand the free fall drop test?
ASTM D-5487-98
Is the product withstand vertical shock test?

Disclaimer: Although the author had exhaustively researched all sources to ensure the accuracy and completeness of the information contained in this blog, but no warranty and fitness is implied. I assumed no responsibility and implied warranty of any kind for errors, inaccuracies, omission, or any inconsistency herein. No liability is assumed for incidental or consequential damages in connection with the use of the information contained herein. Readers should always use their own judgment and review all related regulatory guidelines. Guidelines can change over time.


Friday, March 18, 2016

Labeling and Packaging Part I

Product packaging and labeling must be treated as an integral part of the medical device itself. Therefore, the product is not completed and could never be released for distribution before it is packaged and all specified labeling and packaging requirements of the quality management system fulfilled. For example products manufacturing must also apply to labeling and packaging as well.
Therefore, any operational procedures and other quality system documentation related to packaging and labeling must be followed, examples are shown below:

Design control, including design validation and control of design output and changes for labeling and packaging;

Control of packaging and labeling processes including personnel training, process
validation, work instructions, process monitoring, and process records;

Inspection and final acceptance of packaging and labeling; and
Establishment and maintenance of necessary records for labeling and packaging.
The following talks about labeling and packaging design and validation. Labeling and packaging design and validation must also be carried out like it is an integral part of the product.

1) Labeling and packaging, and their artwork, are developed in the phase of product design as in any part of the medical device itself. The development processes are implemented in accordance with Operational Procedure for Design Control, to include requirements for design input, design planning, documenting and controlling design output, conducting design reviews, and verifying and validating the labeling and packaging design.

2 ) For example, medical device products to be marketed in the European Union and South Korea, labeling and instructions for use are translated into foreign national languages versions according to the intended plan for placing the product on the respective market. The translation process and the correctness of the translations is undertaken according to the procedures. For examples, translation must be done by qualified translators.

3)  When packaging is designed to meet certain performance requirements, such as sealing the product to protect it from heat, light or contaminants; or structural ability to withstand stacking or shipping loads, the packaging is validated by testing it under actual or simulated conditions of distribution, storage and use. For example, when the medical device is intended to be marketed in a region with high temperature and humidity. The product packaging must be validated again humidity and relative humidity.

4)   Packaging for sterile products is likewise validated to test packaging materials and the seal. There are many types of sterilization techniques such as Wet/steam sterilization, Dry heat sterilization, Ethylene oxide, Sporicidal chemicals, Glass Plasma and Irradiation (Gamma rays).
 
5) Labeling integrity is validated to ensure that labels will remain in place and be legible under normal operating and use conditions. There are many requirements for label like what symbols to use, what font size to use and manufacturing site and expiry are some examples of key information printed on the labels.


Reference
Criteria
ISO 13485: 7.5.5
Has the company established documented procedures or work instructions for preserving the conformity of product labeling during internal processing and delivery to the intended destination?
ISO 13485: 7.5.5
Does this preservation include identification, handling, packaging, storage and protection?
ISO 13485: 7.5.5
Has the company established documented work instruction for the control of product with a limited shelf life or requiring special storage conditions?
ISO 13485: 7.5.5
Are special storage conditions controlled and recorded?
SO 13485: 7.5.5
Have procedures been implemented to ensured, where relevant, that labelling and instructions for use are translated correctly into foreign national languages versions according to the intended plan for placing the product on the market?
ISO 13485: 7.5.5
Is it ensured, where relevant, that requirements for e.g. national language versions are checked and controlled in connection with dispatch, storage, etc.?
ISTA 208, 2A
Is the product withstand all tests stated in the ISTA guidelines
ASTM D 5276-98
Is the product withstand the free fall drop test?
ASTM D 5487-98
Is the product withstand vertical shock test?

Disclaimer: Although the author had exhaustively researched all sources to ensure the accuracy and completeness of the information contained in this blog, but no warranty and fitness is implied. I assumed no responsibility and implied warranty of any kind for errors, inaccuracies, omission, or any inconsistency herein. No liability is assumed for incidental or consequential damages in connection with the use of the information contained herein. Readers should always use their own judgment and review all related regulatory guidelines. Guidelines can change over time.

Saturday, May 23, 2015

Purchasing Control

Some of the key requirements in purchasing controls are always have procedures to evaluate and select potential suppliers, contractors and consultants. Sponsor are advised to have an ‘Approved Supplier List’ where the detail of each sponsor evaluation. How and when it is being evaluated. What is the outcome of each evaluation?

Qualified auditor should physically go to the site to audit thoroughly the whole site and should also re-audit per schedule. Ideally, each supplier must be audited once in two years.
Update the Approved Supplier List regularly. Should any supplier disqualified, inform all purchasing department of the sponsor’s status.

Another key issue is that sponsor must sign a quality agreement with the supplier so that part/parts must be made accordingly to sponsor specification. The quality agreement must be detail to ensure the supplier performs according to the supplier agreement. For example, the sponsor should state specifically that all medical device components must be made per 21 CFR 820 or ISO 13485 etc.

One of the quality problem I had experienced was that sponsor has very poor control of the medical device components suppliers. The suppliers are behaving like the ‘boss’ and not the way around.

Sponsor must have a supplier evaluation form to ‘evaluate’ each supplier. Example of items in the form are: Name, Contact Information, Supplier Quality Certification like ISO 13485, Job/Part Description, Initiation Date, on-time delivery, evaluation results etc.

Of course, another element is the proper documentation of all the purchasing control. I will blog a little bit more detail about purchasing in subsequent blog.
Reference
Criteria
ISO 13485, 7.4.2.a
ISO 13485, 7.4.2.b
ISO 13485, 7.4.2.c
Does purchasing information describe the product to be purchased, including (where appropriate) quality management system requirements?
ISO 13485, 7.4.2
Has the company ensured the adequacy of specified purchase requirements prior to their communication to the supplier?
ISO 13485, 7.4.2
Does the company, to the extent needed for the traceability required, maintain relevant purchasing information, i.e. documents and records?.

Disclaimer: Although the author had exhaustively researched all sources to ensure the accuracy and completeness of the information contained in this blog, but no warranty and fitness is implied. I assumed no responsibility and implied warranty of any kind for errors, inaccuracies, omission, or any inconsistency herein. No liability is assumed for incidental or consequential damages in connection with the use of the information contained herein. Readers should always use their own judgment and review all related regulatory guidelines. Guidelines can change over time.


Saturday, January 24, 2015

Non-Conforming Product

Medical Device Manufacturer should have a system and instructions to identify, document, evaluate and disposition of nonconforming products. Nonconforming products are very expensive to handle and should be prevented its occurrence in the first place.
The system and instruction should applies to all purchased, in-house manufactured materials, components, subassemblies and finished products. The system should also have a form called Product Nonconformity Report Template to record the detail of the nonconformity product and its disposition.

Let us talk about identification, documentation, evaluation, disposition, Advisory Note and Recall for nonconforming products.

Identification: All associates in the company especially QC inspectors and production personnel are responsible for identifying nonconforming products in the course of their inspection and process monitoring activities.

Documentation: When a nonconformity is identified, it should be documented in detail in Nonconformity Report form. Only certain personnel can initiate this form like QC inspectors and Quality Assurance. All other personnel report identified nonconformities to QA.

Disposition: The nonconformity report form should document, the identity of the device in question, department, area, operation where nonconformity occurred. The report should also describes objective facts detailing the nature of the nonconformity. The nonconforming product shall be labeled ‘rejected’ and quarantined until QA decides its disposition- reworked, accepted as-is and scrapped.

Advisory Notices and Recall: When nonconforming product is detected after delivery to the customers, customers should be notified expeditiously and be instructed on how to mitigate or avoid the effects, or potential effects, of the nonconformity. If the product need to be recalled, the sponsor should instruct them how to send back the product in question.

Reference
Criteria
21 CFR 820.90(a)
Has the company established and maintained procedures to control product that does not conform to specified requirements?
21 CFR 820.90(a)
Do the procedures address the identification, documentation, evaluation, segregation, and disposition of a nonconforming product?
21 CFR 820.90(a)
Does the evaluation of nonconformance include a determination of the need for an investigation and notification of the persons or organizations responsible for the nonconformance?
21 CFR 820.90(a)
Have evaluations and investigations been documented?
21 CFR 820.90(b)(1)
Has the company established and maintained procedures that define the responsibility for review and the authority for the disposition of the nonconforming product?
21 CFR 820.90(b)(1)
Do the procedures set forth the review and disposition process?
21 CFR 820.90(b)(1)
Is the disposition of nonconforming product documented?
21 CFR 820.90(b)(1)
Does documentation include the justification for use of nonconforming product and the signature of the individual(s) authorizing the use?
21 CFR 820.90(b)(2)
Has the company established and maintained procedures for rework, including retesting and reevaluation of the nonconforming product after rework, to ensure that the product meets its current approved specifications?
21 CFR 820.90(b)(2)
Are rework and reevaluation activities, including a determination of any adverse effect from the rework upon the product, documented in the device history record (DHR)?

Disclaimer: Although the author had exhaustively researched all sources to ensure the accuracy and completeness of the information contained in this blog, but no warranty and fitness is implied. I assumed no responsibility and implied warranty of any kind for errors, inaccuracies, omission, or any inconsistency herein. No liability is assumed for incidental or consequential damages in connection with the use of the information contained herein. Readers should always use their own judgment and review all related regulatory guidelines. Guidelines can change over time.

Saturday, January 10, 2015

External Quality Audits

As described in previous post entitled “the internal quality audit” and conversely, there should also be an external quality audits program in the medical device company. The internal quality plan is to audit the state of things with the internal quality system while the external audit is to audit the state of things with external business entities associated with the device manufacturer. Examples are contract research organization (CRO), contract manufacturing organization (CMO) and all sort of suppliers of components and parts.

Depending on the complexity of the medical device, sometimes, the sponsors has literally a few to a few hundred suppliers. These suppliers need to be constantly audited to ensure their quality system is in compliance to 21 CFR 820, ISO 13485, ISO 14971 etc.

Therefore, sponsor should have a procedure that can provide a system and instructions and to assign responsibility for conducting external audits of the quality management system of suppliers and CMO.

Aside from the procedure, sponsor should also has external audit plan, audit nonconformity report template, quality audit checklist and a great external quality audit team.

For audit plan: QA is responsible for planning and scheduling external audits of the quality system of CMO manufacturing processes and raw materials suppliers. Because of the enormity of the external audit program, therefore, it is prudent to choose the audit frequency based on status and importance of the processes, products and areas to be audited and as well as results from previous audits, previous nonconformities, CAPA and customer complaints. Typically, each supplier should be audited once in two years.
In the external audit plan, the dates, assignment of audit teams, areas to be audited should be set clearly and to be followed. External audit plans should be synchronized with management reviews of the sponsor’s quality system.

For external audit team: External quality team member should be qualified, experienced, have the necessary education, independent and able to write well and fast. External auditors must have expert level in ISO 13485, 21 CFR 820 and EU MDD, for example.
During the external auditing, external auditors seek objective evidence to demonstrate whether the audited activities conform to the requirements of the documented quality system, and whether the system is effectively implemented and maintained. When nonconformity is noted, it is brought to the attention of, and discussed with, the responsible individual of the department.

At the end of the audit, each noted nonconformity is documented using the audit Nonconformity Report. External audit team should fill out only the first part of the form, describing the nonconformity and handed over to the responsible individual who uses the second part to propose correction, corrective action or perhaps a remediation plan.
Upon receiving the report, the responsible individual investigates the cause/s of the problem noted as a nonconformity, proposes a correction or corrective action to be taken, and indicates the date by which the corrective action will be fully implemented. The external auditor reviews and approves the proposed action.
Documentation and Record: this is a critical part. External audits, implementation of resulting corrective actions, and follow-up audits are documented. At the end of an auditing cycle, all nonconformity reports established during the cycle are compiled and analyzed, and are presented at the management review meeting

Reference
Criteria
ISO 13485 /8.2.2
Are the company’s audit programs planned?
ISO 13485 /8.2.2
Do the audit programs take into consideration the status and importance of the processes and areas to be audited?
ISO 13485 /8.2.2
Do the audit programs take into consideration the results of previous audits?
ISO 13485 /8.2.2
Are the audit criteria, scope, frequency, and methods defined?
ISO 13485 /8.2.2
Does selection of auditors and conduct of audits ensure the objectivity and impartiality of the audit process?
ISO 13485 /8.2.2
Does the audit process ensure that auditors do not audit their own work?
ISO 13485 /8.2.2
Are the responsibilities and requirements for planning and conducting audits, and for reporting audits and maintaining records, defined in a documented procedure?
ISO 13485 /8.2.2
Does management responsible for the area being audited ensure that actions are taken without undue delay to eliminate detected nonconformities and their causes?
ISO 13485 /8.2.2
Do follow-up activities include the verification of the actions taken and the reporting of verification results?

Disclaimer: Although the author had exhaustively researched all sources to ensure the accuracy and completeness of the information contained in this blog, but no warranty and fitness is implied. I assumed no responsibility and implied warranty of any kind for errors, inaccuracies, omission, or any inconsistency herein. No liability is assumed for incidental or consequential damages in connection with the use of the information contained herein. Readers should always use their own judgment and review all related regulatory guidelines. Guidelines can change over time.


Thursday, December 25, 2014

Internal Quality Audit

A medical device company should have a robust internal quality audit program which consists of procedure, internal audit team, plan, quality audit checklist to audit the quality system regularly.

For quality audit plan:  Quality Assurance (QA) should be responsible for the planning and scheduling of internal audits of the quality system, manufacturing processes and products. QA should establish audit frequency. The audit frequency is often based on the importance of manufacturing processes, products and areas. Should there be customer complaints, internal and external nonconformities regarding a product and process, internal audit for that area of interest should be carried out as well.

Internal audit should be performed at the very least once a year or semiannually or quarterly. I had observed some medical device company performed internal audit monthly, but only on a specific section of the quality system. For example, January on Design Verification and February on CAPA.

The internal quality audit plan should be mapped out clearly in a matrix with all the quality system elements like that of 21 CFR 820 and ISO 13485. In this plan, there should be responsible group who will be performing the internal audit on the desired date of the audit.

The audit team should consist of qualified, experienced and independent quality auditors who are very well versed in the quality system about to be audited. Audit team should not succumb to internal pressure so they may water down the internal audit report. I had basically seen this occurrence where the marketing group had complaint to the top management that the severity of the internal audit causes slowness in releasing product and therefore the internal audit did not perform the job they should be doing. The internal audit team should perform the job without fear or favor.

During the audit, auditors seek objective evidence demonstrating whether the audited activities conform to the requirements of the documented quality system, and whether the system is effectively implemented and maintained. When nonconformity is noted, it is brought to the attention of, and discussed with, the responsible individual of the department in question.
Before the end of the audit, each noted nonconformity is documented using the Audit Nonconformity Report form. Auditors fill out only the first part of the form, describing the noted nonconformity. The form is then handed over to the responsible individual who uses its second part to propose a corrective action.
Documentation and record: Internal audits, implementation of resulting corrective actions, and follow-up audits are documented using the audit nonconformity report form.
At the end of an auditing cycle, all nonconformity reports established during the cycle are compiled and analyzed, and are presented at the management review meeting.

Reference
Criteria
ISO 13485
8.2.2
Does the company conduct internal audits at planned intervals to determine whether the quality management system conforms to the planned arrangements?
ISO 13485
8.2.2
Does the company conduct internal audits at planned intervals to determine whether the quality management system conforms to the requirements of ISO 9001:2000?
ISO 13485
8.2.2
Does the company conduct internal audits at planned intervals to determine whether the quality management system conforms to the quality management system requirements established by the company?
ISO 13485
8.2.2
Does the company conduct internal audits at planned intervals to determine whether the quality management system is effectively implemented and maintained?
ISO 13485
8.2.2
Are the company’s audit programs planned?
Do the audit programs take into consideration the status and importance of the processes and areas to be audited?
Do the audit programs take into consideration the results of previous audits?
ISO 13485
8.2.2
Are the audit criteria, scope, frequency, and methods defined?
Does selection of auditors and conduct of audits ensure the objectivity and impartiality of the audit process?
ISO 13485
8.2.2
Does the audit process ensure that auditors do not audit their own work?
Are the responsibilities and requirements for planning and conducting audits, and for reporting audits and maintaining records, defined in a documented procedure?
ISO 13485
8.2.2
Does management responsible for the area being audited ensure that actions are taken without undue delay to eliminate detected nonconformities and their causes?
Do follow-up activities include the verification of the actions taken and the reporting of verification results?

Disclaimer: Although the author had exhaustively researched all sources to ensure the accuracy and completeness of the information contained in this blog, but no warranty and fitness is implied. I assumed no responsibility and implied warranty of any kind for errors, inaccuracies, omission, or any inconsistency herein. No liability is assumed for incidental or consequential damages in connection with the use of the information contained herein. Readers should always use their own judgment and review all related regulatory guidelines. Guidelines can change over time.